
Periscopio Fluted Beige Fabric Sofa by Studiopepe
USD 20,700
Ships in 13-14 weeks

Artemest imagines the garden of Palazzo Donizetti as a space where Pompeii is felt through matter, form, and color—not reconstructed, but held as a quiet presence, revealed in the voids and in the gestures that shape the space. Columns set a measured rhythm; sculptures remain as silent witnesses; wrought iron traces lines as light as resting shadows.
Across the surfaces, signs of transformation appear. Charred wood holds the passage of fire. Copper and brass gather dense reflections, like matter rising from a volcanic core. Marble and ceramics retain a memory that is never fully spoken. Everything is measured, nothing ornamental—each element exists for what it suggests.
Greenery moves through the space as a continuous presence, shifting perception. The garden settles into a suspended threshold, where time seems to pause, allowing what endures—and what may yet happen—to emerge.



USD 20,700
Ships in 13-14 weeks

USD 30,600
Ships in 6-7 weeks

USD 4,550
Ships in 1-2 weeks

USD 8,760
Ships in 5-6 weeks

USD 12,625
Ships in 13-14 weeks

USD 1,595
Ships in 4-5 weeks

USD 1,560
Ships in 5-6 weeks

USD 7,310
Ships in 15-16 weeks

USD 6,445
Ships in 6-7 weeks

USD 11,290
Ships in 3-4 weeks

USD 690
Ships in 4-5 weeks

USD 4,650
Ships in 2-3 weeks

USD 12,275
Ships in 13-14 weeks

USD 3,690
Ships in 3-4 weeks

USD 1,415
Ships in 3-4 weeks

USD 8,855
Ships in 6-7 weeks

USD 8,210
Ships in 6-7 weeks

USD 10,740
Ships in 17-18 weeks

USD 1,490
Ships in 4-5 weeks

USD 1,780
Ships in 4-5 weeks

USD 1,575
Ships in 17-18 weeks

USD 3,690
Ships in 3-4 weeks

USD 1,200
Ships in 4-5 weeks

USD 1,220
Ships in 5-6 weeks

USD 1,675
Ships in 4-5 weeks

USD 14,640
Ships in 7-8 weeks

USD 970
Ships in 2-3 weeks

USD 2,050
Ships in 5-6 weeks

USD 4,980
Ships in 13-14 weeks

USD 18,720
Ships in 4-5 weeks

USD 13,310
Ships in 5-6 weeks

USD 515
Ships in 2-3 weeks

USD 4,025
Ships in 3-4 weeks

USD 385
Ships in 2-3 weeks

USD 14,760
Ships in 17-18 weeks

USD 3,125
Ships in 7-8 weeks

USD 2,735
Ships in 11-12 weeks

USD 4,770
Ships in 10-11 weeks

USD 23,235
Ships in 13-14 weeks

USD 10,250
Ships in 1 week

USD 11,710
Ships in 1 week

USD 1,675
Ships in 1 week

USD 4,835
Ships in 1 week

USD 4,685
Ships in 1 week